Guest bath. Floor 80 sf. Protect $150. Remove floor 80 × $3. Tile labor 80 × $12. Grout/setting materials $180. Debris $120. Owner supplies tiles. No shower, plumbing or substrate repairs. Tax treatment / schedule / payment terms not supplied.

DEMONSTRATION CONTRACTOR • NOT AN ACTUAL QUOTE

Guest bathroom
floor tile replacement

Prepared for: Sample homeowner
Project: Illustrative 80 sq ft guest bathroom
Status: Draft for contractor review

ScopeQuantity × rateAmount
Protect adjacent work areas1 × $150$150
Remove existing floor finish80 sq ft × $3$240
Install owner-supplied floor tile — labor80 sq ft × $12$960
Setting materials and grout1 × $180$180
Debris removal1 × $120$120
Subtotal before any applicable tax$1,650

Included work

Protect adjacent work areas; remove existing bathroom floor finish; install owner-supplied tile over a suitable, prepared substrate; grout the installed floor; remove resulting debris.

Materials & exclusions

Owner supplies floor tile. Setting materials and grout are included as listed. Shower work, plumbing and substrate repairs are excluded. Any additional work requires a separate scope and price approved before proceeding.

This is a presentation example, not a contract or a construction offer from BEYRICH.

INTERNAL REVIEW / NOT FOR CUSTOMER RELEASE

Confirm before issuing

Arithmetic check: 150 + 240 + 960 + 180 + 120 = $1,650.